Tired of wasting time promoting a relatively clean, low-cost energy option opposed by the entire ruling political class from Barack Obama and U.S. Sen. Harry Reid on down, electric utility NV Energy formally withdrew its application through the Nevada Public Utilities Commission to build the Ely Energy Center.
http://www.vinsuprynowicz.com/?p=260
